Home


Project

New biomass CHP plant in Elsinore

08.06.2015

Gottlieb Paludan Architects will be responsible for the architectural design of a new biomass-fired CHP plant in Elsinore. The new plant will be an addition to the existing Elsinore CHP and will, with a prominent location near the main approach road to the city, become a beacon of Elsinore's green and sustainable ambitions. The work will be completed in 2018.

"We are very pleased to have signed a contract with an architectural consultant with such an extensive experience in the energy and utilities sector, and we look forward to an exciting and constructive cooperation," says senior project manager Claus Bo Frederiksen from Elsinore Utilities. Download the full press release below (in Danish).